Thursday, February 19, 2015
Rush Job Go on site measure existing graphic Rush Job for JG Stewart Construction: Go on site measure existing graphic,Back to shop, redraw graphic, flip it for the other side, add some colour. Back to site, remove existing graphic, remove all adhesive, clean area, apply new graphic. Customer very happy, done before the truck arrived to pick it up. This loader is about 12' feet high, tires are around 6'.
Posted at 03:44 PM